Project
Your Engineering Solution with JUN E&C
Your Engineering Solution with JUN E&C
| No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
|---|---|---|---|---|---|---|---|---|
| 1 | WELCRON Hantec | Yeosu Industrial Waste Incineration Facility | Industrial Waste Incinerator (105TPD x 1Train) | 48,000 Nm³/h (200℃) | 1 | 2023.12 | SDR + WS | EP |
| 2 | KOLON Environmental Service | Hankook Tire Geumsan Plant | Phyroiysis(Waste Tire) Gas and Oil Boiler | 37,000 Nm³/h (350℃) | 1 | 2017.10 | SDR | EPC |
| 3 | GS E&C | Chungju Clean Center | Municipal Refuse Incineration (200TPD x 1Train) | 33,101 Nm³/h, wet (210℃) | 1 | 2010.08 | SDR | EPC |
| 4 | DONGBU Corporation | Yangju Resource Recovery Facility | Municipal Refuse Incineration (100TPD x 2Trains) | 30,654 Nm³/h, wet (200℃) | 2 | 2010.04 | SDR | EPC |
| 5 | POSCON | Pohang Steelworks | Iron & Steel Works | 1,131,544 Am³/h | 1 | 2010.03 | Plasma Reactor | EPC |
| 6 | POSCON | Pohang Steelworks | Iron & Steel Works | 735,093 Am³/h | 1 | 2010.03 | Plasma Reactor | EPC |
| 7 | GS E&C | Masan Municipal Solid Waste Management Facility | Municipal Refuse Incineration (200TPD x 1Train) | 47,110 Nm³/h, wet (210℃) | 1 | 2009.09 | SDR | EPC |
| 8 | HALLA E&E | Pangyo Clean Tower | Municipal Refuse Incineration (50TPD x 2Trains) | 14,308 Nm³/h, wet (200 ℃) | 2 | 2009.05 | SDR | EPC |
| 9 | HALLA E&E | Masan-Changwon Wastewater Treatment Plant | Wastewater treatment area (sludge) | 15,568 Nm³/h, wet (200 ℃) | 1 | 2008.08 | WS | EPC |
| 10 | KOLON E&C | Busan Jeonggwan Environmental Resources Facility | Municipal Refuse Incineration (50TPD x 1Train) | 19,980 Nm³/h, wet (220 ℃) | 1 | 2008.07 | SDR | EPC |