| No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
|---|---|---|---|---|---|---|---|---|
| 1 | KOEN | KOEN Goseong Coal Power Plant | IPP Coal Fired Boiler EP #1 (1,040 MW) | 73,843 Am³/min (95℃) | 1 | 2025.04 | Dry-EP | Dry-EP Internal Inspection Technical Service |
| 2 | KOEN | KOEN Goseong Coal Power Plant | IPP Coal Fired Boiler EP #2 (1,040 MW) | 73,843 Am³/min (95℃) | 1 | 2024.04 | Dry-EP | Dry-EP Internal Inspection Technical Service |
| 3 | KOEN | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler #5 | 46,500 Am³/min (50.6℃) | 1 | 2023.05 | Wet-EP | Wet-EP Internal Inspection Technical Service |
| 4 | SAE-A stx ENTECH | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5 (550 MW) | 46,500 Am³/min, (50.6℃) | 1 | 2021.08 | Wet-EP | Wet-EP Technical Advisor |
| 5 | SAE-A stx ENTECH | KOEN Youngheung Coal Power Plant | TPP Coal Fired Boiler EP #1, #2 (800MW) | 61,600 Am³/min, (110℃) | 2 | 2021.04 | Dry-EP | Dry-EP Mechanical Engineering |
| 6 | SAE-A stx ENTECH | KOEN Youngheung Coal Power Plant | TPP Coal Fired Boiler EP #1, #2 (800 MW) | 61,600 Am³/min, (110℃) | 2 | 2020.12 | Dry-EP | Dry-EP Proposal Engineering |
| 7 | SEONGSHIN Cement | SEONGSHIN Cement Danyang Plant | #5 Clinker Cooler | 15,500 Am³/min, (270℃) | 1 | 2020.11 | Dry-EP | Dry-EP Performance Diagnosis |
| 8 | KOEN | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5, #6 (500 MW) | 46,500 Am³/min, (50.6℃) | 2 | 2020.10 | Wet-EP | Wet-EP Technical Supervision |
| 9 | SAE-A stx ENTECH | SC bluepower(Samcheok Coal Power Plant) | IPP Coal Fired Boiler EP #1, #2 (1050 MW) | 87,306 Am³/min, (91℃) | 2 | 2020.02 | Dry-EP | Dry-EP Proposal Engineering |
| 10 | B.D.I | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5,#6 (550 MW) | 46,500 Am³/min, (50.6℃) | 2 | 2020.03 | Wet-EP | Wet-EP Mechanical Engineering |