No Client Location Application Gas volume (Temp.) Quantity Completion date Equipment Scope of supply
1 KOEN KOEN Goseong Coal Power Plant IPP Coal Fired Boiler EP #2 (1,040 MW) 73,843 Am3/min (95℃) 1 April, 2024 Dry-EP Dry-EP Internal Inspection Technical Service
2 KOEN KOEN Samcheonpo Coal Power Plant TPP Coal Fired Boiler #5 46,500 Am3/min (50.6℃) 1 May, 2023 Wet-EP Wet-EP Internal Inspection Technical Service
3 SAE-A stx ENTECH KOEN Samcheonpo Coal Power Plant TPP Coal Fired Boiler EP #5 (550 MW) 46,500 Am3/min, (50.6℃) 1 Aug, 2021 Wet-EP Wet-EP Technical Advisor
4 SAE-A stx ENTECH KOEN Youngheung Coal Power Plant TPP Coal Fired Boiler EP #1, #2 (800MW) 61,600 Am3/min, (110℃) 2 Apr, 2021 Dry-EP Dry-EP Mechanical Engineering
5 SAE-A stx ENTECH KOEN Youngheung Coal Power Plant TPP Coal Fired Boiler EP #1, #2 (800 MW) 61,600 Am3/min, (110℃) 2 Dec, 2020 Dry-EP Dry-EP Proposal Engineering
6 SEONGSHIN Cement SEONGSHIN Cement Danyang Plant #5 Clinker Cooler 15,500 Am3/min, (270℃) 1 Nov, 2020 Dry-EP Dry-EP Performance Diagnosis
7 KOEN KOEN Samcheonpo Coal Power Plant TPP Coal Fired Boiler EP #5, #6 (500 MW) 46,500 Am3/min, (50.6℃) 2 Oct, 2020 Wet-EP Wet-EP Technical Supervision
8 SAE-A stx ENTECH SC bluepower(Samcheok Coal Power Plant) IPP Coal Fired Boiler EP #1, #2 (1050 MW) 87,306 Am3/min, (91℃) 2 Feb, 2020 Dry-EP Dry-EP Proposal Engineering
9 B.D.I KOEN Samcheonpo Coal Power Plant TPP Coal Fired Boiler EP #5,#6 (550 MW) 46,500 Am3/min, (50.6℃) 2 Mar, 2020 Wet-EP Wet-EP Mechanical Engineering
10 SSANGYONG Cement Donghae Plant #1 Clinker Cooler 16,000 Am3/min, (265℃) 1 Jun, 2019 Dry-EP Dry-EP Performance Diagnosis
  • Client
    한국남동발전(주)
    Location
    한국남동발전 고성발전본부
    Application
    IPP Coal Fired Boiler EP #2 (1,040 MW)
    Gas volume (Temp.)
    73,843 Am3/min (95℃)
    Quantity : 1 Completion date : 2024. 04 Equipment : Dry-EP Scope of supply : Dry-EP 내부점검 기술용역
  • Client
    한국남동발전(주)
    Location
    한국남동발전 삼천포화력본부
    Application
    TPP Coal Fired Boiler #5 (550MW)
    Gas volume (Temp.)
    46,500 Am3/min (50.6℃)
    Quantity : 1 Completion date : 2023. 05 Equipment : Wet-EP Scope of supply : Wet-EP 내부점검 기술용역
  • Client
    세아 STX 엔테크㈜
    Location
    한국남동발전 삼천포화력본부
    Application
    TPP Coal Fired Boiler EP #5 (550 MW)
    Gas volume (Temp.)
    46,500 Am3/min, (50.6℃)
    Quantity : 1 Completion date : 2021. 08 Equipment : Wet-EP Scope of supply : 설치감리기술용역
  • Client
    세아 STX 엔테크㈜
    Location
    한국남동발전 영흥화력본부
    Application
    TPP Coal Fired Boiler EP #1, #2 (800 MW)
    Gas volume (Temp.)
    61,600 Am3/min, (110℃)
    Quantity : 2 Completion date : 2021. 04 Equipment : Dry-EP Scope of supply : 기계설계용역
  • Client
    세아 STX 엔테크㈜
    Location
    한국남동발전 영흥화력본부
    Application
    TPP Coal Fired Boiler EP #1, #2 (800 MW)
    Gas volume (Temp.)
    61,600 Am3/min, (110℃)
    Quantity : 2 Completion date : 2020. 12 Equipment : Dry-EP Scope of supply : 입찰설계용역
  • Client
    성신양회㈜
    Location
    단양공장
    Application
    #5 Clinker Cooler
    Gas volume (Temp.)
    15,500 (270℃)
    Quantity : 1 Completion date : 2020. 11 Equipment : Dry-EP Scope of supply : 성능진단 기술용역
  • Client
    한국남동발전㈜
    Location
    한국남동발전 삼천포화력본부
    Application
    TPP Coal Fired Boiler EP #5, #6 (500 MW)
    Gas volume (Temp.)
    46,500 Am3/min, (50.6℃)
    Quantity : 2 Completion date : 2020. 10 Equipment : Wet-EP Scope of supply : 기술감리용역
  • Client
    세아STX엔테크㈜
    Location
    삼척블루파워(삼척화력발전소)
    Application
    IPP Coal Fired Boiler EP #1, #2 (1050 MW)
    Gas volume (Temp.)
    87,306 Am3/min, (91℃)
    Quantity : 2 Completion date : 2020. 02 Equipment : Dry-EP Scope of supply : 입찰설계용역
  • Client
    비디아이㈜
    Location
    한국남동발전 삼천포화력본부
    Application
    TPP Coal Fired Boiler EP #5,#6 (550 MW)
    Gas volume (Temp.)
    46,500 Am3/min, (50.6℃)
    Quantity : 2 Completion date : 2020. 03 Equipment : Wet-EP Scope of supply : 기계설계용역
  • Client
    쌍용시멘트㈜
    Location
    동해공장
    Application
    #1 Clinker Cooler
    Gas volume (Temp.)
    16,000 Am3/min, (265℃)
    Quantity : 1 Completion date : 2019. 06 Equipment : Dry-EP Scope of supply : 성능진단 기술용역