No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
---|---|---|---|---|---|---|---|---|
1 | KOEN | KOEN Goseong Coal Power Plant | IPP Coal Fired Boiler EP #2 (1,040 MW) | 73,843 Am3/min (95℃) | 1 | April, 2024 | Dry-EP | Dry-EP Internal Inspection Technical Service |
2 | KOEN | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler #5 | 46,500 Am3/min (50.6℃) | 1 | May, 2023 | Wet-EP | Wet-EP Internal Inspection Technical Service |
3 | SAE-A stx ENTECH | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5 (550 MW) | 46,500 Am3/min, (50.6℃) | 1 | Aug, 2021 | Wet-EP | Wet-EP Technical Advisor |
4 | SAE-A stx ENTECH | KOEN Youngheung Coal Power Plant | TPP Coal Fired Boiler EP #1, #2 (800MW) | 61,600 Am3/min, (110℃) | 2 | Apr, 2021 | Dry-EP | Dry-EP Mechanical Engineering |
5 | SAE-A stx ENTECH | KOEN Youngheung Coal Power Plant | TPP Coal Fired Boiler EP #1, #2 (800 MW) | 61,600 Am3/min, (110℃) | 2 | Dec, 2020 | Dry-EP | Dry-EP Proposal Engineering |
6 | SEONGSHIN Cement | SEONGSHIN Cement Danyang Plant | #5 Clinker Cooler | 15,500 Am3/min, (270℃) | 1 | Nov, 2020 | Dry-EP | Dry-EP Performance Diagnosis |
7 | KOEN | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5, #6 (500 MW) | 46,500 Am3/min, (50.6℃) | 2 | Oct, 2020 | Wet-EP | Wet-EP Technical Supervision |
8 | SAE-A stx ENTECH | SC bluepower(Samcheok Coal Power Plant) | IPP Coal Fired Boiler EP #1, #2 (1050 MW) | 87,306 Am3/min, (91℃) | 2 | Feb, 2020 | Dry-EP | Dry-EP Proposal Engineering |
9 | B.D.I | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5,#6 (550 MW) | 46,500 Am3/min, (50.6℃) | 2 | Mar, 2020 | Wet-EP | Wet-EP Mechanical Engineering |
10 | SSANGYONG Cement | Donghae Plant | #1 Clinker Cooler | 16,000 Am3/min, (265℃) | 1 | Jun, 2019 | Dry-EP | Dry-EP Performance Diagnosis |