Project
Your Engineering Solution with JUN E&C
Your Engineering Solution with JUN E&C
| No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
|---|---|---|---|---|---|---|---|---|
| 1 | OCI Gunsan Plant | OCI Gunsan Plant | Wet EP A&B Casing | 150 m³/min | 2 | 2025. 11 | Wet-EP | EPC |
| 2 | GS Banwol Coal Power Plant | GS Banwol Coal Power Plant | Coal Fired Boiler EP #2 (200 t/h) | 7,680 Am³/min, (150℃) | 1 | 2025.08 | Dry-EP | EPC |
| 3 | SGC SOLUTION | SGC SOLUTION Cheonan 2nd Plant | Glass Melting Furnace | 500 Nm³/min, (300℃) | 1 | 2025.04 | Dry-EP | EPC |
| 4 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Fired Boiler EP #3 (240 t/h) | 7,680 Am³/min, (150℃) | 1 | 2023.06 | Dry-EP | EPC |
| 5 | SGC SOLUTION | SGC SOLUTION Cheonan 1st Plant | Glass Melting Furnace | 500 Nm³/min, (300℃) | 1 | 2023.04 | Dry-EP | EPC |
| 6 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Fired Boiler EP #1, #2 (200 t/h) | 7,680 Am³/min, (150℃) | 2 | 2022.08 | Dry-EP | EPC |
| 7 | SeAH M&S | SeAH M&S Yeosu Factory | Molybdenum Roasting Furnace Exhaust | 550 Nm³/min, (300℃) | 1 | 2022.04 | Dry-EP | EPC |
| 8 | KEPS | Yeosu Industrial Complex | Coal Fired Boiler EP #1 (350 t/h) | 8,772 Am³/min, (135℃) | 1 | 2021.05 | Dry-EP | PC |
| 9 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Handling System | 295 Am³/min, (20℃) | 1 | 2020.11 | Bag Filter | EPC |
| 10 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Fired Boiler EP #1, #2 (200 t/h) | 15,360 Am³/min, (150℃) | 2 | 2020.06 | FGD Damper Retrofit | EPC |