| No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
|---|---|---|---|---|---|---|---|---|
| 1 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Fired Boiler EP #1, #2 (200 t/h) | 15,360 Am³/min, (150℃) | 2 | 2018.08 | FGD Duct Replacement | PC |
| 2 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Fired Boiler EP #1 (200 t/h) | 7,680 Am³/min, (150℃) | 1 | 2018.08 | Dry-EP | EPC |
| 3 | B.D.I | KOEN Youngheung Coal Power Plant | TPP Coal Fired Boiler EP Retrofit #2 (800 MW) | 62,000 Am³/min, (115℃) | 1 | 2018.06 | Dry-EP | C |
| 4 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Fired Boiler Dry-EP Retrofit #2 (200 t/h) | 7,680 Am³/min, (150℃) | 1 | 2017.07 | Dry-EP | EPC |
| 5 | DAEWOO E&C / HALLA E&E | MOROCCO JORF LASFAR Power Plant | TPP Coal Fired Boiler EP Maintenance #5 (350 MW) | 31,239 Am³/min, (149℃) | 1 | 2016.03 | Dry-EP | EC |
| 6 | EWP | EWP Donghae Bio Power Plant | TPP Fired Boiler EP Retrofit EP Retrofit #1 (200 MW) | 18,050 Am³/min, (150℃) | 1 | 2015.09 | Dry-EP | EP |
| 7 | A-Jeon E&C | KOEN Hadong Coal Power Plant | TPP Coal Fired Boiler #2, #2 Field (500 MW) | 47,000 Am³/min, (125℃) | 1 | 2015.05 | Dry-EP | PC |
| 8 | HYUNDAI Energy | Yeosu Industrial Complex | Coal Fired Boiler EP #1, #2 (350 t/h) | 8,772 Am³/min, (135℃) | 2 | 2012.01 | Dry-EP | EP |
| 9 | POSCO | POSCO Gwangyang Factory | #2 Hot Strip Mill Fume Exhaust System Wet-EP | 7,000 Am³/min (50℃) | 1 | 2011.04 | Wet-EP | EPC |
| 10 | POSCO | POSCO Gwangyang | Thick Plate Factory Finishing Mill Fume Exhaust System | 4,000 Am³/min (60℃) | 1 | 2010.03 | Wet-EP | EPC |