| No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
|---|---|---|---|---|---|---|---|---|
| 1 | SSANGYONG Cement | Donghae Plant | #1 Clinker Cooler | 16,000 Am³/min, (265℃) | 1 | 2019.06 | Dry-EP | Dry-EP Performance Diagnosis |
| 2 | B.D.I | Anin Coal Power Plant | IPP Coal Fired Boiler EP #1, #2 (1040 MW) | 80,700 Am³/min, (110℃) | 2 | 2018.07 | Dry-EP | Dry-EP Proposal Engineering |
| 3 | AERIX | KALSELTENG 2 CFSPP INDONESIA | TPP Coal Fired Boiler EP #1, #2 (100 MW) | 13,400 Am³/min, (156℃) | 2 | 2018.03 | Dry-EP | Dry-EP Mechanical Engineering |
| 4 | B.D.I | KOMI Boryeong Coal Power Plant | TPP Coal Fired Boiler EP Retrofit #3 (500 MW) | 43,500 Am³/min, (105℃) | 1 | 2017.09 | Dry-EP | Dry-EP Retrofit Proposal Engineering |
| 5 | HALLA E&E | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5, #6 (550 MW) | 47,500 Am³/min, (146℃) | 2 | 2017.09 | Dry-EP | Dry-EP Technical Supervision |
| 6 | HALLA E&E | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5, #6 (550MW) | 47,500 Am³/min, (146℃) | 2 | 2017.09 | Dry-EP | Dry-EP Retrofit Mechanical Engineering |