Project
Your Engineering Solution with JUN E&C
Your Engineering Solution with JUN E&C
No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
---|---|---|---|---|---|---|---|---|
1 | B.D.I | Anin Coal Power Plant | IPP Coal Fired Boiler EP #1, #2 (1040 MW) | 80,700 Am3/min, (110℃) | 2 | July, 2018 | Dry-EP | Dry-EP Proposal Engineering |
2 | AERIX | KALSELTENG 2 CFSPP INDONESIA | TPP Coal Fired Boiler EP #1, #2 (100 MW) | 13,400 Am3/min, (156℃) | 2 | Mar, 2018 | Dry-EP | Dry-EP Mechanical Engineering |
3 | B.D.I | KOMI Boryeong Coal Power Plant | TPP Coal Fired Boiler EP Retrofit #3 (500 MW) | 43,500 Am3/min, (105℃) | 1 | Sep, 2017 | Dry-EP | Dry-EP Retrofit Proposal Engineering |
4 | HALLA E&E | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5, #6 (550 MW) | 47,500 Am3/min, (146℃) | 2 | Sep, 2017 | Dry-EP | Dry-EP Technical Supervision |
5 | HALLA E&E | KOEN Samcheonpo Coal Power Plant | TPP Coal Fired Boiler EP #5, #6 (550MW) | 47,500 Am3/min, (146℃) | 2 | Sep, 2017 | Dry-EP | Dry-EP Retrofit Mechanical Engineering |