No Client Location Application Gas volume (Temp.) Quantity Completion date Equipment Scope of supply
1 B.D.I Anin Coal Power Plant IPP Coal Fired Boiler EP #1, #2 (1040 MW) 80,700 Am3/min, (110℃) 2 July, 2018 Dry-EP Dry-EP Proposal Engineering
2 AERIX KALSELTENG 2 CFSPP INDONESIA TPP Coal Fired Boiler EP #1, #2 (100 MW) 13,400 Am3/min, (156℃) 2 Mar, 2018 Dry-EP Dry-EP Mechanical Engineering
3 B.D.I KOMI Boryeong Coal Power Plant TPP Coal Fired Boiler EP Retrofit #3 (500 MW) 43,500 Am3/min, (105℃) 1 Sep, 2017 Dry-EP Dry-EP Retrofit Proposal Engineering
4 HALLA E&E KOEN Samcheonpo Coal Power Plant TPP Coal Fired Boiler EP #5, #6 (550 MW) 47,500 Am3/min, (146℃) 2 Sep, 2017 Dry-EP Dry-EP Technical Supervision
5 HALLA E&E KOEN Samcheonpo Coal Power Plant TPP Coal Fired Boiler EP #5, #6 (550MW) 47,500 Am3/min, (146℃) 2 Sep, 2017 Dry-EP Dry-EP Retrofit Mechanical Engineering
  • Client
    비디아이㈜
    Location
    안인화력발전소
    Application
    IPP Coal Fired Boiler EP #1, #2 (1040 MW)
    Gas volume (Temp.)
    80,700 Am3/min, (110℃)
    Quantity : 2 Completion date : 2018. 07 Equipment : Dry-EP Scope of supply : 입찰설계용역
  • Client
    ㈜에어릭스
    Location
    인도네시아 KALSELTENG 2 CFSPP
    Application
    TPP Coal Fired Boiler EP #1, #2 (100 MW)
    Gas volume (Temp.)
    13,400 Am3/min, (156℃)
    Quantity : 2 Completion date : 2018. 03 Equipment : Dry-EP Scope of supply : 기계설계용역
  • Client
    비디아이㈜
    Location
    한국중부발전 보령발전본부
    Application
    TPP Coal Fired Boiler EP Retrofit #3 (500 MW)
    Gas volume (Temp.)
    43,500 Am3/min, (105℃)
    Quantity : 1 Completion date : 2017.09 Equipment : Dry-EP Scope of supply : 입찰설계용역
  • Client
    한라산업개발㈜
    Location
    한국남동발전 삼천포화력본부
    Application
    TPP Coal Fired Boiler EP #5, #6 (550 MW)
    Gas volume (Temp.)
    47,500 Am3/min, (146℃)
    Quantity : 2 Completion date : 2017.09 Equipment : Dry-EP Scope of supply : 기술감리용역
  • Client
    한라산업개발㈜
    Location
    한국남동발전 삼천포화력본부
    Application
    TPP Coal Fired Boiler EP #5, #6 (550MW)
    Gas volume (Temp.)
    47,500 Am3/min, (146℃)
    Quantity : 2 Completion date : 2017.09 Equipment : Dry-EP Scope of supply : 기계설계용역