Project
Your Engineering Solution with JUN E&C
Your Engineering Solution with JUN E&C
No | Client | Location | Application | Gas volume (Temp.) | Quantity | Completion date | Equipment | Scope of supply |
---|---|---|---|---|---|---|---|---|
1 | GS E&R | GS E&R Banwol Coal Power Plant | Coal Fired Boiler Dry-EP Retrofit #2 (200 t/h) | 7,680 Am3/min, (150℃) | 1 | July, 2017 | Dry-EP | EPC |
2 | DAEWOO E&C / HALLA E&E | MOROCCO JORF LASFAR Power Plant | TPP Coal Fired Boiler EP Maintenance #5 (350 MW) | 31,239 Am3/min, (149℃) | 1 | Mar, 2016 | Dry-EP | EC |
3 | EWP | EWP Donghae Bio Power Plant | TPP Fired Boiler EP Retrofit EP Retrofit #1 (200 MW) | 18,050 Am3/min, (150℃) | 1 | Sep, 2015 | Dry-EP | EP |
4 | A-Jeon E&C | KOEN Hadong Coal Power Plant | TPP Coal Fired Boiler #2, #2 Field (500 MW) | 47,000 Am3/min, (125℃) | 1 | May, 2015 | Dry-EP | PC |
5 | Hyundai Energy | Yeosu Industrial Complex | Coal Fired Boiler EP #1, #2 (350 t/h) | 8,772 Am3/min, (135℃) | 2 | Jan, 2012 | Dry-EP | PC |
6 | POSCO | POSCO Gwangyang Factory | #2 Hot Strip Mill Fume Exhaust System Wet-EP | 7,000 Am3/min (50℃) | 1 | Apr, 2011 | Wet-EP | EPC |
7 | POSCO | POSCO Gwangyang | Thick Plate Factory Finishing Mill Fume Exhaust System | 4,000 Am3/min (60℃) | 1 | Mar, 2010 | Wet-EP | EPC |
8 | DONGBU Steel | DONGBU Steel Dangjin Factory | Finishing Mill Fume Exhaust System | 4,500 Am3/min (40ºC) | 1 | Jun, 2009 | Wet-EP | EPC |