GS E&R Banwol Coal Power Plant Dry-EP Revamping

GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping
GS E&R 반월발전처 Dry-EP Revamping

Buyer
GS E&R
Location
GS E&R Banwol Coal Power Plant
Applications
Coal Fired Boiler EP #1, #2 (200 t/h)
installed capacity
7,680 Am3/min, (150℃)
Quantity
2
Completion date
Aug, 2022
form
Dry-EP
Scope of supply
EPC
닫기